The indoor & outdoor units are within 3 meters of each other.
No Electrical work included in the installation costs.
Our HILTI drills make drilling faster, ensuring that our clients are not inconvenienced for a long period of time. Our drills are attached to a vacuum cleaner giving our clients a DUST FREE drilling experience.
Installation - Back to Back for a Midwall Split unit - Copper
The cost of a standard installation includes the following:
-
Up to 3 meters of refrigerant piping, drain pipe and cable
-
Outdoor mounting bracket (if required)
-
Installation to a maximum height of 3metres above ground level
-
Drilling of one hole for piping
-
Holes will be filled but not painted
We will quote for all costs in addition to the 3 meter installation which will include but are not limited to the following:
-
Any required piping and cabling in addition to the piping and cabling referred to above, or electrical connection to the main switchboard
-
Travelling expenses in the event of the installation being out of a 50km radius from where the unit was bought
-
Any other extras, including but not limited to:
-
external isolators and additional electrical work required
-
any additional refrigerant piping, insulation, drain pipe and cable
-
trunking to cover piping
-
Uninstall of existing unit
-
Any Additional Changes Made by the Client.
-
If working on heights above 5m is required, the end user will be charged for scaffolding and outdoors will need to be placed at lower positioning for safety of technicians and for future maintenance of units
-
Please note costs of isolators and a condensate pump are not included in the installation fee.
-